SAE London V1 Drum Room

 

Complete

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

In progress
iso rubber base frame base lining base sand base lid door
  lead ceiling pbrd inner pbrd outer    
     

 

 

 

The noise transmission specification for this job was quite high due to the presence of residential accomodation close by above.

Isolation rubber floor mounts under a sand filled base, lead reinforced solid core door an lead reinforced woodwool ceiling.